Pre-Stowage Planning: How Cargo Intake Is Calculated Before Loading

Pre-stowage planning is the early calculation of how much cargo a vessel can safely load before arrival at the loading port, considering draft, load line, water density, bunkers, ballast, port limits and voyage conditions.