Skip to content
BRENT 111.50 +8.17%
EUR/USD 1.12060 -2.11%
FRO 52.75 +10.91%
STNG 85.16 +4.81%
SBLK 29.22 -3.88%
ZIM 29.05 -3.46%
Tide Signal
Newsletter

Statement of Facts

Laytime Calculation in Shipping: Worked Time Sheet, Demurrage and Despatch Example

Laytime Calculation in Shipping: Worked Time Sheet, Demurrage and Despatch Example

Laytime calculation turns the charterparty and Statement of Facts into a time account: when laytime starts, which periods count, which periods are excluded, when allowed time expires and whether demurrage or despatch is due. This guide works through a complete loading-port example from valid NOR to final time sheet, including weather stoppages, shifting, time on demurrage and the documentary checks operators should make before submitting or defending a claim.

Read article