Skip to content
BRENT 105.30 +18.43%
EUR/USD 1.16050 +0.51%
FRO 49.04 +28.58%
STNG 84.75 +14.23%
SBLK 31.17 +12.65%
ZIM 29.59 +20.63%
Tide Signal
Newsletter

Laytime Calculation in Shipping

Laytime Calculation in Shipping: Worked Time Sheet, Demurrage and Despatch Example

Laytime Calculation in Shipping: Worked Time Sheet, Demurrage and Despatch Example

Laytime calculation turns the charterparty and Statement of Facts into a time account: when laytime starts, which periods count, which periods are excluded, when allowed time expires and whether demurrage or despatch is due. This guide works through a complete loading-port example from valid NOR to final time sheet, including weather stoppages, shifting, time on demurrage and the documentary checks operators should make before submitting or defending a claim.

Read article